Encirc Glass, Chester Glass
Chester
Location
Chester
Services
Fabrication
Timescale
6 months



A long-standing refrigeration client approached us to modernise critical plant infrastructure without disrupting ongoing operations. To protect production, the project was delivered through a carefully controlled phased removal and installation strategy, allowing the site to remain fully functional throughout.
Our engineering team produced the complete steelwork design, followed by in-house fabrication to guarantee accuracy, traceability, and alignment with the client’s strict specifications. This tight control continued through delivery, with our own lift and shift team managing the handling and placement of all major components on site.
Installation was completed to full PED requirements and certified to EN1090, ensuring the upgraded system met the highest safety and compliance standards. The result was a smooth transition to new equipment, improved reliability for the client, and a future-proofed support structure built to last.