Weekend Industrial Freezer Evaporator Exchange – Slough

Another successful critical weekend project completed by a combined Enco team.

Over Friday, Saturday, and Sunday, Enco Ltd carried out the full mechanical exchange of an industrial freezer evaporator for an end user in Slough, working in close collaboration with Space Engineering Ltd.

The scope included:

  • Disconnection of ammonia supply, suction, and drain connections within the freezer
  • Safe lowering and removal of the existing evaporator
  • Lifting and installation of the new replacement unit.
  • Lifting operatins using 4 x Tirfors secured to structural steelwork within the roof cavity.
  • Coordinated mechanical reconnection works.
  • Insulation reinstatement and finishing.

This operation required precise coordination and teamwork:

  • 5 engineers from Enco Ltd
  • 1 engineer from Enco Lag
  • 4 engineers from our engineering partner
  • 4 Enco engineers working within the roof cavity managing controlled lowering and lifting operations
  • 2 Enco engineers working in extreme temperatures (-21°C to -30°C) inside the freezer, managing lifting connections and coordinating via two-way radios to ensure a safe, controlled exchange

The new evaporator was carefully skated into position while the old unit was skated out and stored safely for disposal.

Mechanical reconnection works included:

  • Preparation of Schedule 40 A333 carbon steel pipework
  • Welding in pre-prepared reducing spools
  • Modification of the drain to accept a 1½” union prior to final reconnection

To complete the works, Enco Lag, sister company of Enco Ltd, reinstated all disturbed insulation and finished in PIB, ensuring the system was left fully protected and professionally completed.

We would like to take this opportunity to thank the Space Engineering team for the strong partnership and coordinated approach that helped make the project a success.

A fantastic example of teamwork, planning, and execution under challenging conditions — delivered safely, efficiently, and within the planned shutdown window.

Well done to everyone involved.